Productivity Improvement Carbody Assembly Line in DMRC
Material type: TextPublication details: 209-2010Description: VII+47 PPSubject(s): Carbody Assembly Line in DMRC | Productivity | Improvement | Carbody | Assembly | Line | in | DMRC | Carbody Assembly Line in DMRCSummary: INTERNAL GUIDE: BALASUBRAMANYAM C, MVJCE EXTERNAL GUIDE: PRASANNA N, BEML LTDItem type | Current library | Collection | Call number | Status | Date due | Barcode |
---|---|---|---|---|---|---|
Institutional Repository | MVJCE CENTRAL LIBRARY | Industrial Engineering & Management | Available | PR1496 |
INTERNAL GUIDE: BALASUBRAMANYAM C, MVJCE EXTERNAL GUIDE: PRASANNA N, BEML LTD
There are no comments on this title.