A Project Report on Kaizen Drive for Cycle Time Reduction

By: SHIMMI A M, ROHAN and RAMKRISHNAMaterial type: TextTextPublication details: 2008-09Description: VI+117 PPSubject(s): Cycle Time Reduction | A | Project | Report | on | Kaizen | Drive | for | Cycle | Time | Reduction | Cycle Time ReductionSummary: INTERNAL GUIDE: S GOPI, MVJCE EXTERNAL GUIDE: M SUBHASH, PRODUCTION MANAGER JOHN CRANE SEALING SYSTEMS
Tags from this library: No tags from this library for this title. Log in to add tags.
    Average rating: 0.0 (0 votes)
Item type Current library Collection Call number Status Date due Barcode
Institutional Repository MVJCE CENTRAL LIBRARY
Industrial Engineering & Management Available PR1494

INTERNAL GUIDE: S GOPI, MVJCE EXTERNAL GUIDE: M SUBHASH, PRODUCTION MANAGER JOHN CRANE SEALING SYSTEMS

There are no comments on this title.

to post a comment.

Powered by Koha