A Project Report on Kaizen Drive for Cycle Time Reduction
Material type: TextPublication details: 2008-09Description: VI+117 PPSubject(s): Cycle Time Reduction | A | Project | Report | on | Kaizen | Drive | for | Cycle | Time | Reduction | Cycle Time ReductionSummary: INTERNAL GUIDE: S GOPI, MVJCE EXTERNAL GUIDE: M SUBHASH, PRODUCTION MANAGER JOHN CRANE SEALING SYSTEMSItem type | Current library | Collection | Call number | Status | Date due | Barcode |
---|---|---|---|---|---|---|
Institutional Repository | MVJCE CENTRAL LIBRARY | Industrial Engineering & Management | Available | PR1494 |
INTERNAL GUIDE: S GOPI, MVJCE EXTERNAL GUIDE: M SUBHASH, PRODUCTION MANAGER JOHN CRANE SEALING SYSTEMS
There are no comments on this title.