A Project Report on Productivity Improvement in Manufacturing Hermetically Seaked Compressor Parts

By: AMITJYOTI DAS, CHAUDHARY and GOPAL KUMARMaterial type: TextTextPublication details: 2006-07Description: XI+51 PPSubject(s): Productivity Improvement in Manufacturing | A | Project | Report | on | Productivity | Improvement | in | Manufacturing | Hermetically | Seaked | Compressor | Parts | Productivity Improvement in ManufacturingSummary: INTERNAL GUIDE: K RAGHAVENDRA, MVJCE EXTERNAL GUIDE: M SHIVANANJAPPA, SENIOR ENGINEER APPLICAMP INDIA LTD
Tags from this library: No tags from this library for this title. Log in to add tags.
    Average rating: 0.0 (0 votes)
Item type Current library Collection Call number Status Date due Barcode
Institutional Repository MVJCE CENTRAL LIBRARY
Mechanical Engineering Available PR1491

INTERNAL GUIDE: K RAGHAVENDRA, MVJCE EXTERNAL GUIDE: M SHIVANANJAPPA, SENIOR ENGINEER APPLICAMP INDIA LTD

There are no comments on this title.

to post a comment.

Powered by Koha